🏗️ New Project Alert: Village of Hope Multi-Family Residential Community in Merced, CA

We're excited to announce that our team has been awarded the framing and drywall scope of work for Village of Hope Phase II, the faith-based expansion of the Merced County Rescue Mission's campus located at 129 W Cone Avenue in Merced, California. InThis phase will provide critical space for the Mission's Hope for Men and Women program, along with a computer lab, classrooms, a chapel, and offices — and we're proud to contribute our craftsmanship to help bring this vision to life.

🏡 About Village of Hope

Merced County Rescue Mission is building a Village of Hope — a 5-acre campus just south of the Fairgrounds in Merced. It is a place where people who have experienced homelessness receive hope and care in a loving environment. Phase I opened in March 2022 and houses the Hope Respite Care, Hope for Veterans, and Hope for Families programs. Phase II includes plans for a chapel, classrooms, computer labs, and offices — and will serve as the home for the Mission's Hope for Men and Women program.

🛠️ Our Scope of Work

Our team is delivering a full framing and drywall package across both buildings, including:

🔩 Structural Framing

  • All labor for framing per architectural and structural plans, including fire-treated lumber

  • Holdown bolt locating and installation of standard holdown systems

  • Supply and install of Simpson structural hardware, nails, and all fasteners

  • All framing lumber and OSB shear plywood per structural schedule

  • Manufactured beams and all floor and roof trusses per structural sheets S3.0–S4.3

  • Forklift for hoisting operations; straightening of bowed or twisted studs to project standards

  • Interior partition framing

  • Structural and non‑structural assemblies

  • Backing, bracing, and support systems

  • Coordination with mechanical, electrical, and plumbing trades

🧱 Drywall

  • 5/8" Type X gypsum board on all interior walls, furred walls, exterior walls, and ceilings per plans

  • 1/2" Type X gypsum board on soundproofing assemblies in Building 4

  • Double-layer 5/8" Type X at corridor ceilings (Buildings 4 & 5) and floor truss ceilings (Building 5)

  • Moisture-resistant 5/8" gypsum board at all applicable wet areas

  • Level 3 finish with medium orange-peel texture throughout

  • USG acoustical caulking; full prep, pointing, sanding, and paint-ready delivery

🌟 Why This Project Matters

This isn't just a construction project — it's a community lifeline. The Merced County Rescue Mission has served the unhoused population of Merced for decades, and Village of Hope Phase II represents the completion of a long-held vision to create a full-service campus where individuals and families can find stability, faith, and a path forward. When these buildings are finished, they will house men and women working to rebuild their lives, with access to education, spiritual support, and professional resources — all under one roof.

We're honored to play a role in making that possible.

📅 Project Updates Coming Soon

As construction progresses, we'll continue sharing updates, photos, and milestones from the field. Our team is committed to delivering exceptional craftsmanship and supporting the successful completion of this meaningful project.

Next
Next

Project Completion Announcement: Big Sandy Rancheria Living Quarters – Auberry, CA